Hacker Newsnew | past | comments | ask | show | jobs | submitlogin

Doctor Yellow.[1] Full rail inspection every ten days.

[1] https://en.wikipedia.org/wiki/Doctor_Yellow



At full speed!


Which matters, because Doctor Yellow inspection trains can be put into the schedule with the regular trains. There's no need to shut down traffic while a slow inspection car chugs along.

BART recently got a full-speed inspection car.[1] They needed a specially built one because BART has a non-standard track gauge.

The Federal Railroad Administration has track inspection cars, but only six of them for the whole country. One was seen on CALTRAIN track.[2]

[1] https://www.youtube.com/watch?v=GHa1Si7CW8Q

[2] https://www.youtube.com/watch?v=RQcRHn9YiPg




Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: